Skip to content
URC Support
한국어
ENGLISH (US)
Español
TBH300 Setup Check the Wires Step
Check that the wires are screwed into the terminal blocks firmly.
글 내비게이션
Previous:
TBH300 Setup Heat Pump 2nd Stage Finish Step
Next:
TBH300 Setup Pull Wires Step