Skip to content
URC Support
Español
ENGLISH (US)
한국어
TBH300 Setup Check the Wires Step
Check that the wires are screwed into the terminal blocks firmly.
Navegación de entradas
Previous:
TBH300 Setup Heat Pump 2nd Stage Finish Step
Next:
TBH300 Setup Pull Wires Step